SUMMARY OF RECENT ODOR CONTROL EXPERIENCE

*Please click on a project to view the project description.

PROJECT/CLIENT PLANT SIZE (MGD) ODOR STUDY DESIGN TYPE OF ODOR CONTROL SELECTED OR DESIGNED YEAR COMPLETE
Fayetteville, AR West Side WWTP
McGoodwin, Williams & Yates
10 Design of odor control systems for new wastewater treatment plant In progress Designing covers, ductwork and centralized biological odor control systems for new plant. 2004
Old Henry Pump Station & Force Main Odor Control
Sabak, Wilson & Lingo Inc.
6.3 Design assistance and review for odor control system for new pump station and force main In progress 1,500 cfm carbon adsorber for wet wells, chemical injection system for force main, carbon inserts for air release valve manholes 2004
Port St. Lucie, FL (Glades WWTF)
Arcadis - Reese, Macon & Assoc.
6 Odor dispersion modeling for plant in design phase Not included Not included 2003
Fredericksburg, VA
Whitman, Requardt and Assoc.
3.5 Odor assessment, H2S testing Next phase Draft report submitted 2003
Grand Chute/Menasha, WI WWTP
CH2M Hill
5 Odor testing, report testing results Not included CH2M Hill submitted draft report 2003
West County Wastewater District Richmond, CA 8 Odor evaluation including odor dispersion modeling Next phase Draft report submitted 2003
Village of Mamaroneck, NY Waste Transfer Station N/A Odor and VOC testing, odor modeling, community odor surveys, odor control recommendations Next phase Draft report submitted 2003
Town of Ocean City, Maryland - Whitman Requardt and Assoc. 15 Treatment plant and Waste Tranfer Station odor testing, H2S testing, odor modeling and evaluation of alternatives Next phase Draft report submitted 2003
Vallejo Sanitation and Flood Control District, California - Carollo Engineers 15.5 Testing reduced sulfur compounds and VOCs in secondary process Not included Evaluate carbon adsorber or biofilter for the bioroughing tower 2003
West County WWTP, Louisville, KY - GRW Engineers (design/build) 22 Selected custom built biofilter with new synthetic media In progress 12,000 cfm biofilter with BacTee polyethylene support structure 2004
Eastern Avenue Pump Station, Baltimore, Md
Whitman Requardt and Assoc.
140 Odor testing, H2S testing and odor modeling Next phase 2- 12,000 cfm carbon adsorbers for wet well and screens 2004
Mill Creek WWTP, Cincinnati, Ohio
CH2M Hill
105 Detailed testing and evaluation of packed bed scrubber under different operating conditions, measure CO2 H2S, pH and ORP Not included 10,500 cfm scrubber upgrade and modifications to chemical feed systems 2002
Orlando, FL Conserv II WPCF City of Orlando, FL 30 Odor control master plan Complete Project to cover aeration basin channels and GBT's and use biological treatment is under construction. 2004
Colorado Springs Utility District, Colorado 30 Performance testing for reduced sulfur compounds from odor control units Not included Tested inlet and outlet of iron sponge and Sulfatreat dry scrubbers 2002
Massaponax WWTP, Fredericksburg, Virginia
H.E. Sargent, Inc.
15 Performance testing of carbon adsorber for H2S removal Not included Tested Phoenix carbon unit 2002
Iron Bridge WPCF, Orlando, Florida
Boyle Engineers
25 Evaluated alternatives to treat air from new flow equalization basins In progress Selected to modify existing humidification chamber and biofilter to allow increase in air flow. Biofilter previously designed by WEA 2003
Downington Regional WPCC, Downington, PA
Downington Area Regional Authority (DARA)
7.5 Odor testing to determine odor emission rates and odor modeling and prepare a report of findings Not required Found low odor levels and no controls recommended at this time 2002
Morris Forman WWTP, Louisville, KY Metropolitan Sewer District 105 Extensive testing of 2-20,000 cfm scrubbers and optimization study Complete Modifications to scrubber chemical feed systems, including pumps and controls 2003
Jeffersontown WWTP, Louisville, KY Metropolitan Sewer District 15 Master Plan study for the plant, including odor testing, odor modeling and public meetings Complete Design channel covers and selected carbon adsorption and activated sludge diffusion 2002
West County WWTP, Louisville, KY Metropolitan Sewer District 25 Master Plan study for the plant, including odor testing and odor modeling. Public meetings and meetings with Air Pollution Control Board Complete Design covers for grit channels and aeration basin channels, ventilation for screening building, and carbon adsorbers, synthetic media biofilter and activated sludge diffusion 2002
Hilton Head collection system, Hilton Head, SC
Hilton Head #1 Public Service District
5 Extensive study of collection system and pump stations to identify highest sources of H2S due to severe corrosion problems Not included Evaluated chemical feed systems and recommended Bioxide and magnesium hydroxide addition at key pump stations 2002
Plant No. 1, Orange County, California
Orange County Sanitary District
80 Set up and performed demonstration project of oxygen ionization at the Grit Dumpster Building in turnkey project Design of demonstration Oxygen ionization tested at various conditions including with H2S injection 2003
Moore WWTP, Moore, Oklahoma
US Filter Operating Services
12 Reduced sulfur compound testing from sludge holding tank because of many odor complaints. Evaluated alternative treatments. Complete Modified existing carbon vessels into a bioscrubber with special media for H2S and RSC treatment 2002
Columbus collection system, Columbus, Ohio
Division of Sewerage and Drainage
Large sewer system Identification of source of sewer odors by testing H2S and sewer pressures. Set up large fans to exhaust sewer air and measure pressures Not included Recommended biofilters to exhaust air and keep sewers under negative pressure. Treatment with biofilters recommended 2002
Unity Facility in Helena, Arkansas
Unified Environmental Services
400 tons/day Sludge from New York City hauled to this facility to produce an ammonium sulfate fertilizer. Performed odor, VOC and RSC testing Complete Devised a complete air treatment train for 70,000 cfm of air including venturi, acid scrubber and regenerative thermal oxidizer on-going
Broken Arrow, OK
McGoodwin, Williams & Yates
6 Odor study, community odor survey, recommended odor control alternatives Complete Recommended phased approach with follow-up testing to evaluate effectiveness of first phase, which was chemical feed in collection system. Follow-up testing may be scheduled in 2004. 2001
Half Moon Bay WWTP, California
Sewer Authority Mid Coast Side
4 Evaluation of odor sources due to complaints and assessment of current technologies. Proactive approach for future considerations. Not included Evaluated 3 stage scrubber and other odor control systems and recommended a course of action to address major concerns 2001
Rte. 108 Pump Station, Howard County, MD Whitman Requardt and Associates 6 Evaluation of hydrogen sulfide generation and emissions in historical town and pilot testing project with Bioxide and oxygen injection In progress Evaluated chemical treatment alternatives including Bioxide, hydrogen peroxide, iron salts and pure oxygen injection. Selected oxygen injection with on-site production using pressure swing adsorption and side stream injection 2001
Conserv II WPCF, Orlando, Florida
Brown and Caldwell
30 Evaluation of alternatives to treat air from new pump station and equalization basins Included Selected 2 stage bioscrubber for EQ tank and single stage bioscrubber and second stage biofilter for pump station wet well 2003
Town Branch and West Hickman Creek WWTP
Lexington Fayette Urban County Government Lexington, Kentucky
25 and 30 Compete studies at each plant to identify major odor sources and to evaluate alternatives for treatment Complete Designed channel covers, carbon adsorbers, activated sludge diffusion and modified existing scrubbers and oxygen ionization system for BFP room 2001
Consulting Services for Louisville & Jefferson County Metropolitan Sewer District Various Odor consultant to large sewer district On-going work Multiple projects completed under on-going consulting services agreement On-going
Consulting Services for City of Orlando, FL Various Odor consultant to large sewer district On-going work Multiple projects completed under on-going consulting services agreement On-going