WEBSTER ENVIRONMENTAL ASSOCIATES, INC.
SUMMARY OF RECENT ODOR CONTROL EXPERIENCE
* Please click on a project to view the project description.
  PLANT ODOR   TYPE OF ODOR CONTROL YEAR PROJECT
PROJECT/CLIENT SIZE (MGD) STUDY DESIGN SELECTED OR DESIGNED COMPLETE FEE ($)
Fayetteville, AR West Side WWTP 10 Design of odor control systems for new wastewater In progress Designing covers, ductwork and centralized 2004 $239,000
McGoodwin, Williams & Yates   treatment plant   biological odor control systems for new plant.    
             
Old Henry Pump Station & Force Main Odor Control 6.3 Design assistance and review for odor control systems In progress 1,500 cfm carbon adsorber for wet wells, chemical 2004 $6,200
Sabak, Wilson & Lingo Inc.   for new pump station and force main   injection system for force main, carbon inserts for    
        air release valve manholes    
             
Port St. Lucie, FL (Glades WWTF) 6 Odor dispersion modeling for plant in design phase Not included Not included 2003 $10,400
Arcadis - Reese, Macon & Assoc.            
             
Fredericksburg, VA 3.5 Odor assessment, H2S testing Next phase Draft report submitted 2003 $8,500
Whitman, Requardt and Assoc.            
             
Grand Chute/Menasha, WI WWTP 5 Odor testing, report testing results Not included CH2M Hill submitted draft report 2003 $10,000
CH2M Hill            
             
West County Wastewater District 8 Odor evaluation including odor dispersion modeling Next phase Draft report submitted 2003 $23,000
Richmond, CA            
             
Village of Mamaroneck, NY Waste Transfer N/A Odor and VOC testing, odor modeling, community Next phase Draft report submitted 2003 $79,500
Station   odor surveys, odor control recommendations        
             
Town of Ocean City, Maryland - 15 Treatment plant and Waste Tranfer Station odor Next phase Draft report submitted 2003 $30,000
  Whitman Requardt and Assoc.   testing, H2S testing, odor modeling and evaluation        
    of alternatives        
             
Vallejo Sanitation and Flood Control District, 15.5 Testing reduced sulfur compounds and Not included Evaluate carbon adsorber or biofilter for 2003 $15,000
   California - Carollo Engineers   VOCs in secondary process   the bioroughing tower    
             
West County WWTP, Louisville, KY - 22 Selected custom built biofilter with In progress 12,000 cfm biofilter with BacTee 2004 $50,000
GRW Engineers (design/build)   new synthetic media   polyethylene support structure    
             
Eastern Avenue Pump Station, Baltimore, Md 140 Odor testing, H2S testing and odor Next phase 2- 12,000 cfm carbon 2004 $42,000
  Whitman Requardt and Assoc.   modeling   adsorbers for wet well and screens    
             
Mill Creek WWTP, Cincinnati, Ohio 105 Detailed testing and evaluation of Not included 10,500 cfm scrubber upgrade and 2002 $28,000
   CH2M Hill   packed bed scrubber under different   modifications to chemical feed systems    
    operating conditions, measure CO2        
    H2S, pH and ORP        
             
Orlando, FL Conserv II WPCF 30 Odor control master plan Complete Project to cover aeration basin channels and GBT's 2004 $92,000
City of Orlando, FL       and use biological treatment is under construction.    
             
Colorado Springs Utility District, Colorado 30 Performance testing for reduced sulfur Not included Tested inlet and outlet of iron sponge and 2002 $10,000
    compounds from odor control units   Sulfatreat dry scrubbers    
             
Massaponax WWTP,  Fredericksburg, Virginia 15 Performance testing of carbon adsorber Not included Tested Phoenix carbon unit 2002 $7,500
   H.E. Sargent, Inc.   for H2S removal        
             
Iron Bridge WPCF, Orlando, Florida 25 Evaluated alternatives to treat air from In progress Selected to modify existing humidification 2003 $35,000
    Boyle Engineers   new flow equalization basins   chamber and biofilter to allow increase    
        in air flow. Biofilter previously    
        designed by WEA    
             
Downington Regional WPCC, Downington, PA 7.5 Odor testing to determine odor emission Not required Found low odor levels and no controls 2002 $25,000
   Downington Area Regional Authority (DARA)   rates and odor modeling and prepare a report   recommended at this time    
    of findings        
             
Morris Forman WWTP, Louisville, KY 105 Extensive testing of 2-20,000 cfm scrubbers and Complete Modifications to scrubber chemical feed 2003 $15,000
   Metropolitan Sewer District   optimization study   systems, including pumps and controls    
             
Jeffersontown WWTP, Louisville, KY 15 Master Plan study for the plant, including Complete Design channel covers and selected carbon 2002 study- $15,000
    Metropolitan Sewer District   odor testing, odor modeling and public meetings   adsorption and activated sludge diffusion   design- $30,000
             
West County WWTP, Louisville, KY 25 Master Plan study for the plant, including Complete Design covers for grit channels and aeration 2002 study- $25,000
    Metropolitan Sewer District   odor testing and odor modeling. Public meetings   basin channels, ventilation for screening   design- $80,000
    and meetings with Air Pollution Control Board   building, and carbon adsorbers, synthetic    
        media biofilter and activated sludge diffusion    
             
Hilton Head collection system, Hilton Head, SC 5 Extensive study of collection system and Not included Evaluated chemical feed systems and 2002 50000
   Hilton Head #1 Public Service District   pump stations to identify highest sources   recommended Bioxide and magnesium    
    of H2S due to severe corrosion problems   hydroxide addition at key pump stations    
             
Plant No. 1, Orange County, California 80 Set up and performed demonstration project Design of Oxygen ionization tested at various 2003 $100,000
   Orange County Sanitary District   of oxygen ionization at the Grit Dumpster demonstration conditions including with H2S injection    
    Building in turnkey project project      
             
Moore WWTP, Moore, Oklahoma 12 Reduced sulfur compound testing from sludge Complete Modified existing carbon vessels into a 2002 $12,000
    US Filter Operating Services   holding tank because of many odor   bioscrubber with special media for H2S and    
    complaints. Evaluated alternative treatments.   RSC treatment    
             
Columbus collection system, Columbus, Ohio Large sewer Identification of source of sewer odors by Not included Recommended biofilters to exhaust air and 2002 $20,000
    Division of Sewerage and Drainage system testing H2S and sewer pressures. Set up   keep sewers under negative pressure. Treatment    
    large fans to exhaust sewer air and measure   with biofilters recommended    
    pressures        
             
Unity Facility in Helena, Arkansas 400 tons/day Sludge from New York City hauled to this facility Complete Devised a complete air treatment train for on-going $50,000
    Unified Environmental Services   to produce an ammonium sulfate fertilizer.   70,000 cfm of air including venturi, acid    
    Performed odor, VOC and RSC testing   scrubber and regenerative thermal oxidizer    
             
Broken Arrow, OK 6 Odor study, community odor survey, recommended Complete Recommended phased approach with follow-up 2001 $37,000
McGoodwin, Williams & Yates   odor control alternatives   testing to evaluate effectiveness of first phase, which    
        was chemical feed in collection system.  Follow-up    
        testing may be scheduled in 2004.    
             
Half Moon Bay WWTP, California 4 Evaluation of odor sources due to complaints and Not included Evaluated 3 stage scrubber and other 2001 $15,000
    Sewer Authority Mid Coast Side   assessment of current technologies. Proactive   odor control systems and recommended    
    approach for future considerations.   a course of action to address major concerns    
             
Rte. 108 Pump Station, Howard County, MD 6 Evaluation of hydrogen sulfide generation and In progress Evaluated chemical treatment alternatives 2001 $50,000
    Whitman Requardt and Associates   emissions in historical town and pilot testing   including Bioxide, hydrogen peroxide, iron    
    project with Bioxide and oxygen injection   salts and pure oxygen injection. Selected    
        oxygen injection with on-site production using    
        pressure swing adsorption and side stream    
        injection    
             
Conserv II WPCF, Orlando, Florida 30 Evaluation of alternatives to treat air from new Included Selected 2 stage bioscrubber for EQ tank 2003 $55,000
    Brown and Caldwell   pump station and equalization basins   and single stage bioscrubber and second    
        stage biofilter for pump station wet well    
             
Town Branch and West Hickman Creek WWTP 25 and 30 Compete studies at each plant to identify major Complete Designed channel covers, carbon 2001 $250,000
    Lexington Fayette Urban County Government   odor sources and to evaluate alternatives for   adsorbers, activated sludge diffusion and    
    Lexington, Kentucky   treatment   modified existing scrubbers and oxygen    
        ionization system for BFP room    
             
Consulting Services for Louisville & Jefferson Various Odor consultant to large sewer district On-going work Multiple projects completed under on-going On-going  
County Metropolitan Sewer District       consulting services agreement    
             
Consulting Services for City of Orlando, FL Various Odor consultant to large sewer district On-going work Multiple projects completed under on-going On-going  
        consulting services agreement